How To Inspect A Copper Granulator Machine After A Major Overhaul?
May 27, 2026
I. Preliminary Self-Inspection and Functional Testing
1. Self-Inspection by Construction Personnel: After maintenance, the maintenance team will conduct a comprehensive inspection of replaced parts, assembly accuracy, and lubrication points.
2. No-Load Test Run: Start the equipment and run it idle for at least 30 minutes to confirm there are no abnormal vibrations, unusual noises, or overheating.
3. Calibration of Key Parameters: Check whether the temperature control system, frequency converter settings, and hydraulic pressure have returned to the required process values.
II. Team-Level Acceptance (Team Leader/Responsible Person)
1. Check whether the maintenance records are complete, including the model of replaced parts, torque tightening values, alignment data, etc.
2. Verify the effectiveness of safety protection devices, such as the emergency stop button, overload protection, and interlock devices, to ensure they respond normally.
3. Confirm that there are no leaks in the lubrication system, cooling system, and air/oil circuits, and that the operating pressure is stable.
III. Acceptance by Professional Technicians
1. Precision Testing: Use a dial indicator to measure spindle runout; concentricity deviation should be ≤0.05mm; screw and bushing clearance should be controlled within the range of 0.2–0.3mm.
2. Electrical System Inspection: Check motor insulation resistance, wiring tightness, and the rationality of inverter parameter settings.
3. Technical Supervision Items: If a high-temperature smelting area is involved, thermal engineers must confirm that the heaters and thermocouples are working normally, and the temperature control accuracy is within ±5℃.
IV. Comprehensive Operation Acceptance (Production Trial Run)
1. Load Trial Run: Continuously operate with material for no less than 4 hours, monitoring whether indicators such as current, temperature, and output are stable.
2. Particle Quality Assessment: Sample and check particle forming rate, particle size uniformity, and pulverization rate; the pass rate should be ≥95%.
3. Energy Consumption Comparison: Compare with historical data before the overhaul; there should be no significant increase in motor current and unit energy consumption.
V. Final Acceptance
1. The acceptance will be jointly organized by the equipment management department, safety supervision department, and maintenance command center.
2. Review all acceptance records, trial operation reports, and the closed-loop status of safety hazard rectification.
3. Sign the "Equipment Overhaul Completion Acceptance Form," confirming that the equipment is ready for formal production use.